CETC is nearing the completion of a “turnkey” installation for a Refined Coal processing system at this location. 1,100 TPH coal will be removed from the transport conveyors to the boiler coal bunkers via Plows, processed into refined coal, and then returned to parallel belt conveyors to transport the refined coal to the Generating Plant. …
Read more
About: JM Online
Recent Posts by JM Online
CCMA – Metals and Alloys
CETC recently started up a “turnkey” installation for handling woodchips, quartz, coal, and iron for feeding to the existing storage system to process Silicon alloys for the Steel Industry. The system included the development of the system to receive materials from front-end loader (reclaiming from storage piles), receiving hopper, and transfer belt conveyors to existing…
Read more
NorthStar BlueScope Steel (Ohio)
CETC was awarded the Feasibility study for an in-plant HBI/DRI Handling system to receive this material from the nearby Cliffs Mining HBI Plant in Toledo, Ohio via truck and/or rail. The system provided for both long and short-term storage and transfer to “Twin Station” EAF’s inside the Melt Shop. This study is to be followed…
Read more
Hastings Utilities, Hastings, Nebraska
CETC recently completed a plant upgrade to the refined coal process at this location. Existing equipment was removed and a “new” system incorporating the use of Pocket Belt conveying and horizontal mixer to process the coal for two (2) coal-fired units at this Generating Power Station. Removal of the existing equipment and installation of “new”…
Read more
First Bauxite Corporation
Completed an Engineering Feasibility Study for a Mining operation for Bauxite, haul road to Plant Site, Plant site along river for the storage and reclaim of processed bauxite to be loaded onto ship in Guyana, South America. In addition, provided Engineering and Feasibility Study for a Proppant Plant in south Louisiana. This plant would receive…
Read more