CETC was awarded the Feasibility study for an in-plant HBI/DRI Handling system to receive this material from the nearby Cliffs Mining HBI Plant in Toledo, Ohio via truck and/or rail. The system provided for both long and short-term storage and transfer to “Twin Station” EAF’s inside the Melt Shop. This study is to be followed…
Read more
Hastings Utilities, Hastings, Nebraska
CETC recently completed a plant upgrade to the refined coal process at this location. Existing equipment was removed and a “new” system incorporating the use of Pocket Belt conveying and horizontal mixer to process the coal for two (2) coal-fired units at this Generating Power Station. Removal of the existing equipment and installation of “new”…